Smith Co., MS
  • Discovered by Tellus in 2016 with Proprietary 3-D Seismic. 
  • Current Production: 430 BOPD; 1 Producing Well. 
  • Cumulative Production: 160 MBO. 
  • 1,000 acres held by production (“HBP”). 
  • Currently designing waterflood with expected EUR of 4 MMBO+.